Construction Planning & Scheduling

Plan and control project using bar chart, S-curve and LOB methods. Draw and calculate project networks for planning and scheduling using CPM, Proceeding and PERT methods. Construction method statement, resource allocation and leveling and time cost scheduling.

Course ID
CIEM 334
Level
Undergraduate
Professors
Credit Hours
CH:3

1. Demonstrate planning and scheduling methods (bar chart, S-curve, CPM, PERT, Proceeding and resource scheduling)
2. Ability to identify project plans, control, method statement & organization
3. Draw the project networks and estimate total project duration
4. Estimate and draw project resource allocation/leveling and cost scheduling
5. Create WBS, project schedule & resource histogram
6. Work in a team environment
7. Search for information and refer to relevant literatures

• Introduction to project planning and scheduling in construction
• Time Management, WBS, bar chart, & S-curve methods
• AOA & Critical path method
• Critical path method (advanced topics)
• AON & Proceeding method
• PERT method
• Resources allocation and leveling
• Construction method statement and alternative study
• Cost Scheduling
• Project Organization
• Project communication & procurement
• Project Plans, control and computer applications